EMPLOYEE MPS
71.2
| Status | CSM | Company | RFP ID | Name | Published | GMV |
|---|---|---|---|---|---|---|
| New RFP | Prasetya Imansyah | EDUCATION INSTITUTION | 4143 | Pengadaan dan Pemasangan Kaca Film 3M Ceramic IM5 80% Black | 2026-08-29 | 167.3M |
| New RFP | Prasetya Imansyah | Arya Noble | 4141 | RFQ Motor 15 Kw - Urgent | 2026-08-29 | — |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4137 | Kebutuhan Fuel Pump Injection (FIP) Seri BH6P120 PN S00016266+01 | 2026-08-28 | — |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4133 | (COSTING CALCULATION) PENGIRIMAN UNIT TIPE WHEEL LOADER 655D KE BANDUNG JAWA BARAT | 2026-08-28 | 6.0M |
| New Stage | Prasetya Imansyah | EDUCATION INSTITUTION | 4091 | Pengadaan Unit Gree GVC-48TS(S) Deluxe Floor TS Series AC Standing 5 PK di Kota Medan | 2026-08-28 | 24.0M |
| New Stage | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4055 | 10330307 - Printer Epson L3250 (FINALISASI) | 2026-08-28 | 3.0M |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4128 | Permintaan Tukar/Trade in Velg/Rim 19.50 & Tire from 23.5-25 to Velg/Rim 22.00/3.00 & Tire 26.5-25 | 2026-08-27 | — |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4127 | (COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 818F DAN GRADER 915F KE RIAU | 2026-08-27 | — |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4120 | (COSTING CALCULATION) PENGIRIMAN UNIT TIPE WHEEL LOADER 655D KE TANAH GROGOT KALIMANTAN TIMUR | 2026-08-26 | 47.0M |
| New RFP | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4119 | (COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 822D KE KONAWE SULAWESI TENGGARA | 2026-08-26 | 65.5M |
| New Stage | Prasetya Imansyah | PT. TRI SWARDANA UTAMA | 4041 | 10329298, 10330098 ATK PULOGADUNG dan HO AGUSTUS 2026 (FINALISASI) | 2026-08-26 | 1.5M |
| New Stage | Prasetya Imansyah | Arya Noble | 4068 | RFQ Kebutuhan Micro/Mini PC Dell - (FPS 3171) | 2026-08-26 | 71.6M |
| New Stage | Prasetya Imansyah | EDUCATION INSTITUTION | 3753 | Exhibition Booth (New Stage) | 2026-08-26 | 63.8M |
| New RFP | Prasetya Imansyah | EDUCATION INSTITUTION | 4091 | Pengadaan Unit Gree GVC-48TS(S) Deluxe Floor TS Series AC Standing 5 PK di Kota Medan | 2026-08-24 | 24.0M |
| New RFP | Prasetya Imansyah | PT Anugerah Pharmindo Lestari | 4087 | Speed Door at 5 Branches - PT Anugerah Pharmindo Lestari | 2026-08-24 | — |
| Company / CSM | All-time ↑ | This month | GMV | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Pub↑ | Cmp↑ | CwW↑ | CwW% | B1 | Pub | AVGmonth | B2 | CwW | GMV | GMV trend | |
EDUCATION INSTITUTION Prasetya Imansyah | 111 | 89 | 54 | 61% | ✓ | 18 | 10.33 | ✓ +10% vs avg | 22 | 4188.7M | |
Arya Noble Prasetya Imansyah | 129 | 92 | 46 | 50% | ✓ | 23 | 26.50 | ✗ | 11 | 1575.6M | |
PT. TRI SWARDANA UTAMA Prasetya Imansyah | 98 | 74 | 53 | 72% | ✓ | 24 | 9.25 | ✓ +10% vs avg | 9 | 1840.9M | |
PT Anugerah Pharmindo Lestari Prasetya Imansyah | 78 | 55 | 9 | 16% | ✗ | 9 | 5.31 | ✗ | 0 | 18548.2M | |
PT CHAKRA JAWARA Prasetya Imansyah | 53 | 49 | 34 | 69% | ✓ | 3 | 5.56 | ✗ | 2 | 10.6M | |
PT. KONISHI LEMINDO INDONESIA Prasetya Imansyah | 39 | 33 | 18 | 55% | ✓ | 3 | 4.00 | ✗ | 1 | 4.2M | |
PT. OCS GLOBAL SERVICES Prasetya Imansyah | 38 | 30 | 3 | 10% | ✗ | 0 | — | ✗ | 0 | — | |
| CSM | Company | C-Level | Meet Format | Meet Date | Result |
|---|---|---|---|---|---|
| No CSM meetings this week. | |||||
| Portfolio | 7 |
| Active this month | 6 |
| New registrations | 0 |
| Non-publishing | 1 |