TSM Weekly Report

Week: 2026-07-06 - 2026-07-12  ·  Faten Rusli
Generated at 2026-07-12 20:13 UTC

KPI (MTD) · July 2026

EMPLOYEE MPS
67.5
Team avg: 33.4
74.554.467.5MayJunJul
T1 Quality of sourcing
25%
Total RFPs: 8
Result_count: 5
Result, %: 62.5%
Weight: 40
21.88.925MayJunJul
Show tenders (5)
  • 3109RFQ Riksa Uji K3 - FPS 239717.9%diff: 26.4%
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)17.9%diff: 24.6%
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA17.9%diff: 1%
  • 3023Produksi Dompet dan Pouch17.9%diff: 27.4%
  • 3202RFQ Consumable dan Alat Kerja17.9%diff: 32.5%
T2 Timing of sourcing
10%
Total RFPs: 8
Result_count: 8
Result, %: 100%
Weight: 10
101010MayJunJul
Show tenders (8)
  • 3109RFQ Riksa Uji K3 - FPS 239717.9%diff: 26.4%
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN17.9%diff: -1.5%
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)17.9%diff: 24.6%
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA17.9%diff: 1%
  • 3023Produksi Dompet dan Pouch17.9%diff: 27.4%
  • 3202RFQ Consumable dan Alat Kerja17.9%diff: 32.5%
  • 3225RFQ Riksa Uji K3 - FPS 242917.9%diff: -17.9%
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang17.9%diff: -17.9%
T3 Zero-bid RFPs
10%
Total RFPs: 8
Result_count: 8
Result, %: 100%
Weight: 10
10010MayJunJul
Show tenders (8)
  • 3109RFQ Riksa Uji K3 - FPS 239717.9%diff: 26.4%
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN17.9%diff: -1.5%
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)17.9%diff: 24.6%
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA17.9%diff: 1%
  • 3023Produksi Dompet dan Pouch17.9%diff: 27.4%
  • 3202RFQ Consumable dan Alat Kerja17.9%diff: 32.5%
  • 3225RFQ Riksa Uji K3 - FPS 242917.9%diff: -17.9%
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang17.9%diff: -17.9%
T4 RFPs with 3+ bids
22.5%
Total RFPs: 8
Result_count: 6
Result, %: 75%
Weight: 30
32.735.622.5MayJunJul
Show tenders (6)
  • 3109RFQ Riksa Uji K3 - FPS 239717.9%diff: 26.4%
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN17.9%diff: -1.5%
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)17.9%diff: 24.6%
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA17.9%diff: 1%
  • 3023Produksi Dompet dan Pouch17.9%diff: 27.4%
  • 3225RFQ Riksa Uji K3 - FPS 242917.9%diff: -17.9%

Operational Metrics

Workflow

Active RFP
11
6 companies
Team avg: 13.6
-4 (-27%) vs prev
913151106-1506-2206-2907-06
Show details (11)
  • 2869Renovasi Pengadaan Waterplay - Sekolah di Bekasi0 bids
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN5 bids
  • 3202RFQ Consumable dan Alat Kerja2 bids
  • 3225RFQ Riksa Uji K3 - FPS 24293 bids
  • 3262PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA0 bids
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang1 bids
  • 3293RFQ Kawat Las13 bids
  • 3314Pengolahan limbah B3 - Jabodetabek dan Jawa Barat2 bids
  • 3323Pengolahan limbah B3 - Daerah Kalimantan, Sulawesi, Ambon0 bids
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 24870 bids
  • 3332RFQ Stiker Form - FPS 23478 bids
New RFP
5
Public — 5, Private — 0
Team avg: 8.4
+1 (+25%) vs prev
194506-1506-2206-2907-06
Show details (5)
  • 3293RFQ Kawat Las13 bids
  • 3314Pengolahan limbah B3 - Jabodetabek dan Jawa Barat2 bids
  • 3323Pengolahan limbah B3 - Daerah Kalimantan, Sulawesi, Ambon0 bids
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 24870 bids
  • 3332RFQ Stiker Form - FPS 23478 bids
New stage
1
1 companies
Team avg: 0.6
0 vs prev
241106-1506-2206-2907-06
Show details (1)
  • 3262PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA0 bids
Completed RFP
5
Public — 5, Private — 0
Team avg: 4
+3 (+150%) vs prev
512506-1506-2206-2907-06
Show details (5)
  • 2952Stage 2 - RFQ IT Supplies dan Elektronik - (FPS 2106)9 bids
  • 3109RFQ Riksa Uji K3 - FPS 23977 bids
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi7 bids
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)4 bids
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA4 bids
Public Completed <3 bids
0
0 companies
Team avg: 1.2
-1 (-100%) vs prev
001006-1506-2206-2907-06
Public Completed without winner
1
1 companies
Team avg: 2
0 vs prev
001106-1506-2206-2907-06
Show details (1)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi7 bids

Execution

Workbench cards (delivery, relevance, Relevant → Bids) are calculated on first-phase tenders only — TSM scores the full invited pool in phase 1; phases 2+ are shown for reference and excluded from these cards.
Workbench tasks delivery rate
99%
311 done / 314 total
Team avg: 77.4%
-1.0 (-1%) vs prev
1001001009906-1506-2206-2907-06
Show details (9)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)38 / 38
  • 3109RFQ Riksa Uji K3 - FPS 239724 / 24
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN25 / 26
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi35 / 37
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)35 / 35
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA45 / 45
  • 3202RFQ Consumable dan Alat Kerja49 / 49
  • 3225RFQ Riksa Uji K3 - FPS 242928 / 28
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang32 / 32
Workbench relevance rate
64%
199 relevant / 311 done
Team avg: 78.7%
+3.7 (+6%) vs prev
69.982.960.36406-1506-2206-2907-06
Show details (18)
  • AI — 68 rel / 180 done
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)T:20 D:20 R:9 (45%)
  • 3109RFQ Riksa Uji K3 - FPS 2397T:20 D:20 R:0 (0%)
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASINT:20 D:20 R:12 (60%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall BekasiT:20 D:20 R:8 (40%)
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)T:20 D:20 R:2 (10%)
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERAT:20 D:20 R:6 (30%)
  • 3202RFQ Consumable dan Alat KerjaT:20 D:20 R:4 (20%)
  • 3225RFQ Riksa Uji K3 - FPS 2429T:20 D:20 R:9 (45%)
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - SubangT:20 D:20 R:18 (90%)
  • TSM — 131 rel / 134 done
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)T:18 D:18 R:18 (100%)
  • 3109RFQ Riksa Uji K3 - FPS 2397T:4 D:4 R:4 (100%)
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASINT:6 D:6 R:5 (83.3%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall BekasiT:17 D:17 R:15 (88.2%)
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)T:15 D:15 R:15 (100%)
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERAT:25 D:25 R:25 (100%)
  • 3202RFQ Consumable dan Alat KerjaT:29 D:29 R:29 (100%)
  • 3225RFQ Riksa Uji K3 - FPS 2429T:8 D:8 R:8 (100%)
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - SubangT:12 D:12 R:12 (100%)
Workbench AI: Relevant → Bids
8.8%
6 applied / 68 denom
Team avg: 7.1%
+0.2 (+2%) vs prev
2211.18.68.806-1506-2206-2907-06
Show details (9)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)1 applied / 9 (11.1%)
  • 3109RFQ Riksa Uji K3 - FPS 23970 applied / 0 (0%)
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN1 applied / 12 (8.3%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi0 applied / 8 (0%)
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)0 applied / 2 (0%)
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA1 applied / 6 (16.7%)
  • 3202RFQ Consumable dan Alat Kerja0 applied / 4 (0%)
  • 3225RFQ Riksa Uji K3 - FPS 24292 applied / 9 (22.2%)
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang1 applied / 18 (5.6%)
Workbench TSM: Relevant → Bids
8.4%
11 applied / 131 denom
Team avg: 6.9%
-1.4 (-14%) vs prev
15.45.69.88.406-1506-2206-2907-06
Show details (9)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)3 applied / 18 (16.7%)
  • 3109RFQ Riksa Uji K3 - FPS 23970 applied / 4 (0%)
  • 3126RENOVASI RUANG MCU RUMAH SAKIT DI BANJARMASIN0 applied / 5 (0%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi4 applied / 15 (26.7%)
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)1 applied / 15 (6.7%)
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERA2 applied / 25 (8%)
  • 3202RFQ Consumable dan Alat Kerja1 applied / 29 (3.4%)
  • 3225RFQ Riksa Uji K3 - FPS 24290 applied / 8 (0%)
  • 3271Kebutuhan PE Film, Plastik Wrap dan Proective Film - Subang0 applied / 12 (0%)
Avg Bids per RFP (90 d)
5.3
55 RFP (90d)
293 bids total
Team avg: 5.5
-0.2 (-4%) vs prev
5.55.65.55.306-1506-2206-2907-06
Home Winner Rate (90 d)
25%
6 home / 24 with winner (90d)
Team avg: 30.8%
-3.6 (-13%) vs prev
27.327.328.62506-1506-2206-2907-06
Show by TSM (1)
  • Faten Rusli — 6 / 24 (25%)
Invited Winner Rate (90 d)
45.8%
TSM: 11 · AI: 3 · Cust: 3
No invite info: 9 / 24 total (90d)
Team avg: 27.9%
+7.7 (+20%) vs prev
40.940.938.145.806-1506-2206-2907-06
Show details (24)
  • 1512[After Nego] Renovasi Ruang Medical Check Up - Rumah Sakit di Kebon Jeruk (Submission after Direct Negotiation DEADLINE 14 JAN 2026)?
  • 1816[Negotiation] Pekerjaan Struktur ED - Rumah Sakit di Makassar (Negotiation)?
  • 2344Part Server HPE Proliant (Part Number: 468332-B21)AITSM
  • 2360Kawat Las / Welding Consumable?
  • 1974[After Clarification] Renovasi Ruangan Rumah Sakit di Bekasi - IPD KRIS?
  • 2530Unit AC Split wall - 6 pcs - DAIKIN FTC50XV14 2PK SPLIT STANDAR R32 THAILAND FTC 50XV14Cust
  • 2535Monitor ViewSonic VA2432-H 24 inch 1080p IPS 100 Hz LinkCust
  • 2481SAFETY DEVICE UNIT TRITON (FINALISASI)AI
  • 2584MAJUN PEKANBARU DAN JAMBITSM
  • 2639[RFQ] Lenovo ThinkPad X1 Carbon Gen 13 OLEDTSM
  • 2685RFQ Refill APAR EDC Semarang Tendean (FPS 1670)?
  • 2694RFQ Speed Controler (FPS 1575) Tahap 2TSM
  • 2841RFQ Resertifikasi Riksa Uji K3 - FPS 1894?
  • 2936Pembelian Laptop ASUS Vivobook S14 S3407CATSM
  • 2948ATK PT Chakra JawaraTSM
  • 2954RFQ Riksa Uji K3 - FPS 2129TSM
  • 2958RFQ Riksa Uji K3 - FPS 2190AI
  • 297810324065 - ATK HO JUNI 2026TSM
  • 2952Stage 2 - RFQ IT Supplies dan Elektronik - (FPS 2106)TSM
  • 3104Lampu LED Panel dan Material Kelistrikan?
  • 3109RFQ Riksa Uji K3 - FPS 2397?
  • 3117(Re-open) perpanjangan waktu RFP Pouch canvas custom?
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)TSM
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERACustTSM

Summary

Summarising
Total RFP — 125
Summarizing RFP — 24 (19.2% from 125)
Summarizing RFP <3 bids — 8 (33.3% from 24)
Conversion completed→winner
Total RFP — 125
Completed RFP — 94 (75.2% from 125)
Completed RFP with winner — 40 (42.6% from 94)

Team Table last week

TSMActive RFPSummarizing (<3)Completed (<3)Zero bids (summarizing + completed)Workbench delivery %
Faten Rusli1120099%

Focus RFP Next Week (Low Liquidity)

RFP IDCompanyRFP nameTSMBidsInvites SSMAcceptance End
2869EDUCATION INSTITUTIONRenovasi Pengadaan Waterplay - Sekolah di BekasiFaten Rusli0192026-07-17 05:00:00
3314Arya NoblePengolahan limbah B3 - Jabodetabek dan Jawa BaratFaten Rusli2262026-07-17 08:13:05.430000
3323Arya NoblePengolahan limbah B3 - Daerah Kalimantan, Sulawesi, AmbonFaten Rusli062026-07-17 09:51:37.662000
3327Arya NoblePengangkutan dan Pengolahan Limbah Domestik - FPS 2487Faten Rusli052026-07-18 00:57:05.034000

Risks & Focus

Weekly snapshot
Active RFP11
Completed5
Avg Bids per RFP5.3
WB Delivery99%
WB TSM: Rel → Bids8.4%
Risks
  • Avg Bids per RFP declining (2 weeks in a row)
Focus
  • Recruit additional suppliers for RFPs with low bid count