TSM Weekly Report

Week: 2026-08-03 - 2026-08-09  ·  Faten Rusli
Generated at 2026-08-09 19:49 UTC

KPI (MTD) · August 2026

EMPLOYEE MPS
41
Team avg: 52.3
53.567.241JunJulAug
T1 Quality of sourcing
10%
Total RFPs: 10
Result_count: 5
Result, %: 50%
Weight: 20
8.22410JunJulAug
Show tenders (4)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.8%diff: 10.3%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.8%diff: 14.9%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.8%diff: 1.7%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.8%diff: 6.8%
T2 Timing of sourcing
10%
Total RFPs: 10
Result_count: 10
Result, %: 100%
Weight: 10
109.610JunJulAug
Show tenders (9)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.8%diff: 10.3%
  • 3699Renovasi Kitchen Rumah Sakit di Palembang16.8%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.8%diff: 14.9%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.8%diff: -1.9%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.8%diff: 1.7%
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.8%diff: 57.2%
  • 3786RFQ konsultan perencanaan16.8%diff: -16.8%
  • 3809Polo Shirt for Service Dept16.8%diff: 33.2%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.8%diff: 6.8%
T3 Zero-bid RFPs
0%
Total RFPs: 10
Result_count: 8
Result, %: 80%
Weight: 0
09.60JunJulAug
Show tenders (8)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.8%diff: 10.3%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.8%diff: 14.9%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.8%diff: -1.9%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.8%diff: 1.7%
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.8%diff: 57.2%
  • 3786RFQ konsultan perencanaan16.8%diff: -16.8%
  • 3809Polo Shirt for Service Dept16.8%diff: 33.2%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.8%diff: 6.8%
T4 RFPs with 3+ bids
21%
Total RFPs: 10
Result_count: 7
Result, %: 70%
Weight: 30
35.32421JunJulAug
Show tenders (7)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.8%diff: 10.3%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.8%diff: 14.9%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.8%diff: -1.9%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.8%diff: 1.7%
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.8%diff: 57.2%
  • 3809Polo Shirt for Service Dept16.8%diff: 33.2%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.8%diff: 6.8%

Operational Metrics

Workflow

Active RFP
16
6 companies
Team avg: 13
0 vs prev
1617161607-1307-2007-2708-03
Show details (16)
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON6 bids
  • 3262[TAHAP 2] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA3 bids
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))5 bids
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA4 bids
  • 3699Renovasi Kitchen Rumah Sakit di Palembang0 bids
  • 3704Publish Article di Media Digital0 bids
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN6 bids
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP5 bids
  • 3757Pengadaan & Pergantian Instalasi HVAC OT1 & OT3 RS di Palembang0 bids
  • 3766PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE KERANG DAYO KALTIM4 bids
  • 3770PENGIRIMAN UNIT TIPE DOZER 818F KE MUKUT BARITO UTARA4 bids
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta4 bids
  • 3786RFQ konsultan perencanaan1 bids
  • 3798RFQ Vendor Psikotest Online - FPS No 29302 bids
  • 3809Polo Shirt for Service Dept6 bids
  • 3849RFP. L07 PISTON PUMP1 bids
New RFP
9
Public — 9, Private — 0
Team avg: 8.6
+5 (+125%) vs prev
644907-1307-2007-2708-03
Show details (9)
  • 3704Publish Article di Media Digital0 bids
  • 3757Pengadaan & Pergantian Instalasi HVAC OT1 & OT3 RS di Palembang0 bids
  • 3766PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE KERANG DAYO KALTIM4 bids
  • 3770PENGIRIMAN UNIT TIPE DOZER 818F KE MUKUT BARITO UTARA4 bids
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta4 bids
  • 3786RFQ konsultan perencanaan1 bids
  • 3798RFQ Vendor Psikotest Online - FPS No 29302 bids
  • 3809Polo Shirt for Service Dept6 bids
  • 3849RFP. L07 PISTON PUMP1 bids
New stage
1
1 companies
Team avg: 1.2
-1 (-50%) vs prev
362107-1307-2007-2708-03
Show details (1)
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))5 bids
Completed RFP
9
Public — 9, Private — 0
Team avg: 7.4
+6 (+200%) vs prev
343907-1307-2007-2708-03
Show details (9)
  • 2869(Tahap Finalisasi Harga) Renovasi Pengadaan Waterplay - Sekolah di Bekasi2 bids
  • 2952Stage 2 - RFQ IT Supplies dan Elektronik - (FPS 2106)9 bids
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi7 bids
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))5 bids
  • 3528Mini Notes8 bids
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)0 bids
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA4 bids
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN6 bids
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP5 bids
Public Completed <3 bids
2
2 companies
Team avg: 1.6
+1 (+100%) vs prev
011207-1307-2007-2708-03
Show details (2)
  • 2869(Tahap Finalisasi Harga) Renovasi Pengadaan Waterplay - Sekolah di Bekasi2 bids
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)0 bids
Public Completed without winner
5
3 companies
Team avg: 4
+4 (+400%) vs prev
211507-1307-2007-2708-03
Show details (5)
  • 2952Stage 2 - RFQ IT Supplies dan Elektronik - (FPS 2106)9 bids
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi7 bids
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)0 bids
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA4 bids
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN6 bids

Execution

Workbench cards (delivery, relevance, Relevant → Bids) are calculated on first-phase tenders only — TSM scores the full invited pool in phase 1; phases 2+ are shown for reference and excluded from these cards.
Workbench tasks delivery rate
99.1%
461 done / 465 total
Team avg: 75%
-0.9 (-1%) vs prev
99.310010099.107-1307-2007-2708-03
Show details (14)
  • 2869Renovasi Pengadaan Waterplay - Sekolah di Bekasi39 / 39
  • 2917RFP HAND PALLET 2.5 TON46 / 46
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)38 / 38
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi35 / 37
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR )37 / 37
  • 3528Mini Notes48 / 48
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)11 / 13
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA31 / 31
  • 3699Renovasi Kitchen Rumah Sakit di Palembang18 / 18
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN26 / 26
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP20 / 20
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta37 / 37
  • 3786RFQ konsultan perencanaan27 / 27
  • 3809Polo Shirt for Service Dept48 / 48
Workbench relevance rate
87.4%
403 relevant / 461 done
Team avg: 86.5%
+1.3 (+2%) vs prev
71.58186.187.407-1307-2007-2708-03
Show details (28)
  • AI — 162 rel / 214 done
  • 2869Renovasi Pengadaan Waterplay - Sekolah di BekasiT:20 D:20 R:11 (55%)
  • 2917RFP HAND PALLET 2.5 TONT:20 D:20 R:6 (30%)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)T:20 D:20 R:9 (45%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall BekasiT:20 D:20 R:8 (40%)
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR )T:19 D:19 R:18 (94.7%)
  • 3528Mini NotesT:23 D:23 R:23 (100%)
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)T:5 D:5 R:1 (20%)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODAT:10 D:10 R:10 (100%)
  • 3699Renovasi Kitchen Rumah Sakit di PalembangT:4 D:4 R:4 (100%)
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATANT:7 D:7 R:7 (100%)
  • 3746RFP.L07 AXIAL FAN & DOSING PUMPT:11 D:11 R:10 (90.9%)
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central YogyakartaT:15 D:15 R:15 (100%)
  • 3786RFQ konsultan perencanaanT:8 D:8 R:8 (100%)
  • 3809Polo Shirt for Service DeptT:32 D:32 R:32 (100%)
  • TSM — 241 rel / 251 done
  • 2869Renovasi Pengadaan Waterplay - Sekolah di BekasiT:19 D:19 R:19 (100%)
  • 2917RFP HAND PALLET 2.5 TONT:26 D:26 R:26 (100%)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)T:18 D:18 R:18 (100%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall BekasiT:17 D:17 R:15 (88.2%)
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR )T:18 D:18 R:18 (100%)
  • 3528Mini NotesT:25 D:25 R:25 (100%)
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)T:8 D:8 R:4 (50%)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODAT:21 D:21 R:21 (100%)
  • 3699Renovasi Kitchen Rumah Sakit di PalembangT:14 D:14 R:14 (100%)
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATANT:19 D:19 R:19 (100%)
  • 3746RFP.L07 AXIAL FAN & DOSING PUMPT:9 D:9 R:9 (100%)
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central YogyakartaT:22 D:22 R:22 (100%)
  • 3786RFQ konsultan perencanaanT:19 D:19 R:15 (78.9%)
  • 3809Polo Shirt for Service DeptT:16 D:16 R:16 (100%)
Workbench AI: Relevant → Bids
3.1%
5 applied / 162 denom
Team avg: 2%
+0.1 (+3%) vs prev
10.34.833.107-1307-2007-2708-03
Show details (14)
  • 2869Renovasi Pengadaan Waterplay - Sekolah di Bekasi0 applied / 11 (0%)
  • 2917RFP HAND PALLET 2.5 TON3 applied / 6 (50%)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)1 applied / 9 (11.1%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi0 applied / 8 (0%)
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR )0 applied / 18 (0%)
  • 3528Mini Notes0 applied / 23 (0%)
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)0 applied / 1 (0%)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA0 applied / 10 (0%)
  • 3699Renovasi Kitchen Rumah Sakit di Palembang0 applied / 4 (0%)
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN0 applied / 7 (0%)
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP0 applied / 10 (0%)
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta0 applied / 15 (0%)
  • 3786RFQ konsultan perencanaan0 applied / 8 (0%)
  • 3809Polo Shirt for Service Dept1 applied / 32 (3.1%)
Workbench TSM: Relevant → Bids
13.7%
33 applied / 241 denom
Team avg: 2.1%
+1.6 (+13%) vs prev
4.71012.113.707-1307-2007-2708-03
Show details (14)
  • 2869Renovasi Pengadaan Waterplay - Sekolah di Bekasi1 applied / 19 (5.3%)
  • 2917RFP HAND PALLET 2.5 TON4 applied / 26 (15.4%)
  • 2952RFQ IT Supplies dan Elektronik - (FPS 2106)3 applied / 18 (16.7%)
  • 3130RFQ IT Supplies dan Elektronik - (FPS 2311) EU Summarecon Mall Bekasi4 applied / 15 (26.7%)
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR )5 applied / 18 (27.8%)
  • 3528Mini Notes4 applied / 25 (16%)
  • 3552RFQ Refinish Ulang Meja kasir yang pudar dan mengelupas - (FPS 2484)0 applied / 4 (0%)
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA0 applied / 21 (0%)
  • 3699Renovasi Kitchen Rumah Sakit di Palembang0 applied / 14 (0%)
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN5 applied / 19 (26.3%)
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP3 applied / 9 (33.3%)
  • 3779NEW RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta0 applied / 22 (0%)
  • 3786RFQ konsultan perencanaan0 applied / 15 (0%)
  • 3809Polo Shirt for Service Dept4 applied / 16 (25%)
Avg Bids per RFP (90 d)
5.3
62 RFP (90d)
327 bids total
Team avg: 5.2
0 vs prev
5.15.25.35.307-1307-2007-2708-03
Home Winner Rate (90 d)
18.2%
4 home / 22 with winner (90d)
Team avg: 29.4%
-9.1 (-33%) vs prev
251927.318.207-1307-2007-2708-03
Show by TSM (1)
  • Faten Rusli — 4 / 22 (18.2%)
Invited Winner Rate (90 d)
45.5%
TSM: 10 · AI: 1 · Cust: 2
No invite info: 11 / 22 total (90d)
Team avg: 26.5%
+13.7 (+43%) vs prev
4038.131.845.507-1307-2007-2708-03
Show details (22)
  • 2694RFQ Speed Controler (FPS 1575) Tahap 2TSM
  • 2841RFQ Resertifikasi Riksa Uji K3 - FPS 1894?
  • 2936Pembelian Laptop ASUS Vivobook S14 S3407CATSM
  • 2948ATK PT Chakra JawaraTSM
  • 2954RFQ Riksa Uji K3 - FPS 2129TSM
  • 2958RFQ Riksa Uji K3 - FPS 2190AI
  • 297810324065 - ATK HO JUNI 2026TSM
  • 3104Lampu LED Panel dan Material Kelistrikan?
  • 3109RFQ Riksa Uji K3 - FPS 2397?
  • 3117(Re-open) perpanjangan waktu RFP Pouch canvas custom?
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)TSM
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERACustTSM
  • 3023Produksi Dompet dan Pouch?
  • 3225RFQ Riksa Uji K3 - FPS 2429?
  • 3202RFQ Consumable dan Alat Kerja (Revisi harga)?
  • 3528Mini NotesTSM
  • 3575Trolley Stainless Steel?
  • 2869(Tahap Finalisasi Harga) Renovasi Pengadaan Waterplay - Sekolah di BekasiTSM
  • 3629Kebutuhan Kabel?
  • 348510327013 - SOLAR PERTAMINA DEX (FINALISASI)Cust
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP?
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))TSM?

Summary

Summarising
Total RFP — 148
Summarizing RFP — 31 (20.9% from 148)
Summarizing RFP <3 bids — 8 (25.8% from 31)
Conversion completed→winner
Total RFP — 148
Completed RFP — 110 (74.3% from 148)
Completed RFP with winner — 48 (43.6% from 110)

Team Table last week

TSMActive RFPSummarizing (<3)Completed (<3)Zero bids (summarizing + completed)Workbench delivery %
Faten Rusli1622299.1%

Focus RFP Next Week (Low Liquidity)

RFP IDCompanyRFP nameTSMBidsInvites SSMAcceptance End
3849ADR GroupRFP. L07 PISTON PUMPFaten Rusli1272026-08-11 05:00:00
3704ZINIT Indonesia PlatformPublish Article di Media DigitalFaten Rusli0302026-08-12 09:00:00

Risks & Focus

Weekly snapshot
Active RFP16
Completed9
Avg Bids per RFP5.3
WB Delivery99.1%
WB TSM: Rel → Bids13.7%
Risks
  • No critical risks identified
Focus
  • Maintain current performance levels