TSM Weekly Report

Week: 2026-08-10 - 2026-08-16  ·  Kania Mega Tantri
Generated at 2026-08-16 19:33 UTC

KPI (MTD) · August 2026

EMPLOYEE MPS
75.4
Team avg: 64.1
79.227.975.4JunJulAug
T1 Quality of sourcing
21.5%
Total RFPs: 13
Result_count: 7
Result, %: 53.8%
Weight: 40
23.3021.5JunJulAug
Show tenders (7)
  • 3621[New Stage Negosiasi Final] RFQ Mesin Gerinda17.8%diff: 5%
  • 3753Exhibition Booth16.8%diff: 21.3%
  • 3764LAMPU LED SOROT 100 WATT16.8%diff: 62.8%
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit16.8%diff: 7.7%
  • 3807RFQ Jaket Coldroom16.8%diff: 31%
  • 3831RFQ Consumable Building - FPS 289016.8%diff: 4.3%
  • 3837RFQ ATI - Plastik HD Roll Emboss16.8%diff: 34%
T2 Timing of sourcing
10%
Total RFPs: 13
Result_count: 13
Result, %: 100%
Weight: 10
109.710JunJulAug
Show tenders (13)
  • 3621[New Stage Negosiasi Final] RFQ Mesin Gerinda17.8%diff: 5%
  • 3753Exhibition Booth16.8%diff: 21.3%
  • 3764LAMPU LED SOROT 100 WATT16.8%diff: 62.8%
  • 3776[First Stage] License Bitrise16.8%diff: -12%
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit16.8%diff: 7.7%
  • 3807RFQ Jaket Coldroom16.8%diff: 31%
  • 3814Water Boiler16.8%diff: -3%
  • 3831RFQ Consumable Building - FPS 289016.8%diff: 4.3%
  • 3837RFQ ATI - Plastik HD Roll Emboss16.8%diff: 34%
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan16.8%diff: -16.8%
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk16.8%diff: -12.5%
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN16.8%diff: -16.8%
  • 3694[Final Stage] Renewal Google Workspace 3 Year Commitment (2026-2029)16.8%diff: 23.9%
T3 Zero-bid RFPs
10%
Total RFPs: 13
Result_count: 13
Result, %: 100%
Weight: 10
9.2010JunJulAug
Show tenders (13)
  • 3621[New Stage Negosiasi Final] RFQ Mesin Gerinda17.8%diff: 5%
  • 3753Exhibition Booth16.8%diff: 21.3%
  • 3764LAMPU LED SOROT 100 WATT16.8%diff: 62.8%
  • 3776[First Stage] License Bitrise16.8%diff: -12%
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit16.8%diff: 7.7%
  • 3807RFQ Jaket Coldroom16.8%diff: 31%
  • 3814Water Boiler16.8%diff: -3%
  • 3831RFQ Consumable Building - FPS 289016.8%diff: 4.3%
  • 3837RFQ ATI - Plastik HD Roll Emboss16.8%diff: 34%
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan16.8%diff: -16.8%
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk16.8%diff: -12.5%
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN16.8%diff: -16.8%
  • 3694[Final Stage] Renewal Google Workspace 3 Year Commitment (2026-2029)16.8%diff: 23.9%
T4 RFPs with 3+ bids
33.8%
Total RFPs: 13
Result_count: 11
Result, %: 84.6%
Weight: 40
36.718.233.8JunJulAug
Show tenders (11)
  • 3621[New Stage Negosiasi Final] RFQ Mesin Gerinda17.8%diff: 5%
  • 3753Exhibition Booth16.8%diff: 21.3%
  • 3764LAMPU LED SOROT 100 WATT16.8%diff: 62.8%
  • 3776[First Stage] License Bitrise16.8%diff: -12%
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit16.8%diff: 7.7%
  • 3807RFQ Jaket Coldroom16.8%diff: 31%
  • 3814Water Boiler16.8%diff: -3%
  • 3831RFQ Consumable Building - FPS 289016.8%diff: 4.3%
  • 3837RFQ ATI - Plastik HD Roll Emboss16.8%diff: 34%
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk16.8%diff: -12.5%
  • 3694[Final Stage] Renewal Google Workspace 3 Year Commitment (2026-2029)16.8%diff: 23.9%

Operational Metrics

Workflow

Active RFP
17
9 companies
Team avg: 14.6
+4 (+31%) vs prev
2013131707-2007-2708-0308-10
Show details (17)
  • 3694[Final Stage] Renewal Google Workspace 3 Year Commitment (2026-2029)6 bids
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan1 bids
  • 3739(PERPANJANG WAKTU) RFQ L24 STICKER ORACAL Tangerang4 bids
  • 3768[TAHAP 2] PENGIRIMAN UNIT TIPE SOIL COMPACTOR 512 KE MUARA SAMU KALTIM8 bids
  • 3776[First Stage] License Bitrise4 bids
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk7 bids
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit4 bids
  • 3807RFQ Jaket Coldroom8 bids
  • 3814Water Boiler5 bids
  • 3831RFQ Consumable Building - FPS 28907 bids
  • 3837RFQ ATI - Plastik HD Roll Emboss4 bids
  • 3890Kebutuhan Label Semicoated 100 x 50 mm3 bids
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN1 bids
  • 3916PENGIRIMAN UNIT TIPE WHEEL LOADER 676D KE KUTAI KALIMANTAN TIMUR2 bids
  • 3942RFQ Kawat Las Böhler FOX 2.5Ni (AWS A5.5: E8018-C1 H4R)1 bids
  • 3965RFQ Kebutuhan rambut untuk analisa0 bids
  • 3975Videotron P3.9 + Instalasi1 bids
New RFP
6
Public — 6, Private — 0
Team avg: 7.6
-3 (-33%) vs prev
269607-2007-2708-0308-10
Show details (6)
  • 3890Kebutuhan Label Semicoated 100 x 50 mm3 bids
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN1 bids
  • 3916PENGIRIMAN UNIT TIPE WHEEL LOADER 676D KE KUTAI KALIMANTAN TIMUR2 bids
  • 3942RFQ Kawat Las Böhler FOX 2.5Ni (AWS A5.5: E8018-C1 H4R)1 bids
  • 3965RFQ Kebutuhan rambut untuk analisa0 bids
  • 3975Videotron P3.9 + Instalasi1 bids
New stage
5
5 companies
Team avg: 3.6
+4 (+400%) vs prev
521507-2007-2708-0308-10
Show details (5)
  • 3694[Final Stage] Renewal Google Workspace 3 Year Commitment (2026-2029)6 bids
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan1 bids
  • 3739(PERPANJANG WAKTU) RFQ L24 STICKER ORACAL Tangerang4 bids
  • 3768[TAHAP 2] PENGIRIMAN UNIT TIPE SOIL COMPACTOR 512 KE MUARA SAMU KALTIM8 bids
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk7 bids
Completed RFP
7
Public — 7, Private — 0
Team avg: 5.2
0 vs prev
337707-2007-2708-0308-10
Show details (7)
  • 3489Kebutuhan Mika Buah Strawberry1 bids
  • 3504Pembelian Material Sparepart July 2026 (Extension Date - Updated Spec)4 bids
  • 3776[First Stage] License Bitrise4 bids
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk7 bids
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit4 bids
  • 3814Water Boiler5 bids
  • 3831RFQ Consumable Building - FPS 28907 bids
Public Completed <3 bids
1
1 companies
Team avg: 1.2
-1 (-50%) vs prev
112107-2007-2708-0308-10
Show details (1)
  • 3489Kebutuhan Mika Buah Strawberry1 bids
Public Completed without winner
2
1 companies
Team avg: 1.6
-1 (-33%) vs prev
113207-2007-2708-0308-10
Show details (2)
  • 3489Kebutuhan Mika Buah Strawberry1 bids
  • 3504Pembelian Material Sparepart July 2026 (Extension Date - Updated Spec)4 bids

Execution

Workbench cards (delivery, relevance, Relevant → Bids) are calculated on first-phase tenders only — TSM scores the full invited pool in phase 1; phases 2+ are shown for reference and excluded from these cards.
Workbench tasks delivery rate
66.6%
1 218 done / 1 829 total
Team avg: 75.1%
+38.7 (+139%) vs prev
3810027.966.607-2007-2708-0308-10
Show details (12)
  • 3489Kebutuhan Mika Buah Strawberry0 / 251
  • 3504Pembelian Material Sparepart July 20260 / 357
  • 3694[RFQ] Renewal Google Workspace 1 Year (2026-2027)96 / 96
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan193 / 193
  • 3776[First Stage] License Bitrise100 / 100
  • 3781NEW RFQ FPS-ECII-2026-2978 Pembuatan Dinding Totem Erha Central Cimanuk64 / 64
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit138 / 138
  • 3807RFQ Jaket Coldroom159 / 159
  • 3814Water Boiler108 / 109
  • 3831RFQ Consumable Building - FPS 2890105 / 107
  • 3837RFQ ATI - Plastik HD Roll Emboss111 / 111
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN144 / 144
Workbench relevance rate
84.2%
1 025 relevant / 1 218 done
Team avg: 70%
+1.6 (+2%) vs prev
93.572.382.684.207-2007-2708-0308-10
Show details (23)
  • AI — 136 rel / 152 done
  • 3504Pembelian Material Sparepart July 2026T:6 D:6 R:0 (0%)
  • 3694[RFQ] Renewal Google Workspace 1 Year (2026-2027)T:34 D:34 R:33 (97.1%)
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di MedanT:7 D:7 R:2 (28.6%)
  • 3776[First Stage] License BitriseT:32 D:32 R:32 (100%)
  • 3781NEW RFQ FPS-ECII-2026-2978 Pembuatan Dinding Totem Erha Central CimanukT:13 D:13 R:13 (100%)
  • 3796Maintenance Tahunan Genset 350 KVA 2 UnitT:13 D:13 R:10 (76.9%)
  • 3807RFQ Jaket ColdroomT:9 D:9 R:8 (88.9%)
  • 3814Water BoilerT:10 D:10 R:10 (100%)
  • 3831RFQ Consumable Building - FPS 2890T:5 D:5 R:5 (100%)
  • 3837RFQ ATI - Plastik HD Roll EmbossT:11 D:11 R:11 (100%)
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLENT:12 D:12 R:12 (100%)
  • TSM — 889 rel / 1677 done
  • 3489Kebutuhan Mika Buah StrawberryT:251 D:251 R:0 (0%)
  • 3504Pembelian Material Sparepart July 2026T:351 D:351 R:0 (0%)
  • 3694[RFQ] Renewal Google Workspace 1 Year (2026-2027)T:62 D:62 R:49 (79%)
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di MedanT:186 D:186 R:175 (94.1%)
  • 3776[First Stage] License BitriseT:68 D:68 R:66 (97.1%)
  • 3781NEW RFQ FPS-ECII-2026-2978 Pembuatan Dinding Totem Erha Central CimanukT:51 D:51 R:50 (98%)
  • 3796Maintenance Tahunan Genset 350 KVA 2 UnitT:125 D:125 R:98 (78.4%)
  • 3807RFQ Jaket ColdroomT:150 D:150 R:130 (86.7%)
  • 3814Water BoilerT:99 D:99 R:59 (59.6%)
  • 3831RFQ Consumable Building - FPS 2890T:102 D:102 R:80 (78.4%)
  • 3837RFQ ATI - Plastik HD Roll EmbossT:100 D:100 R:70 (70%)
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLENT:132 D:132 R:112 (84.8%)
Workbench AI: Relevant → Bids
0%
0 applied / 136 denom
Team avg: 1.2%
-2.4 (-100%) vs prev
8.65.62.4007-2007-2708-0308-10
Show details (10)
  • 3694[RFQ] Renewal Google Workspace 1 Year (2026-2027)0 applied / 33 (0%)
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan0 applied / 2 (0%)
  • 3776[First Stage] License Bitrise0 applied / 32 (0%)
  • 3781NEW RFQ FPS-ECII-2026-2978 Pembuatan Dinding Totem Erha Central Cimanuk0 applied / 13 (0%)
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit0 applied / 10 (0%)
  • 3807RFQ Jaket Coldroom0 applied / 8 (0%)
  • 3814Water Boiler0 applied / 10 (0%)
  • 3831RFQ Consumable Building - FPS 28900 applied / 5 (0%)
  • 3837RFQ ATI - Plastik HD Roll Emboss0 applied / 11 (0%)
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN0 applied / 12 (0%)
Workbench TSM: Relevant → Bids
3.3%
29 applied / 890 denom
Team avg: 4.1%
-2.4 (-42%) vs prev
7.465.73.307-2007-2708-0308-10
Show details (10)
  • 3694[RFQ] Renewal Google Workspace 1 Year (2026-2027)8 applied / 49 (16.3%)
  • 3703[LIVE AUCTION] Pekerjaan Konsultan Struktur RS di Medan0 applied / 175 (0%)
  • 3776[First Stage] License Bitrise4 applied / 66 (6.1%)
  • 3781NEW RFQ FPS-ECII-2026-2978 Pembuatan Dinding Totem Erha Central Cimanuk1 applied / 50 (2%)
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit2 applied / 99 (2%)⚠ 1 irrel
  • 3807RFQ Jaket Coldroom5 applied / 130 (3.8%)
  • 3814Water Boiler1 applied / 59 (1.7%)
  • 3831RFQ Consumable Building - FPS 28903 applied / 80 (3.8%)
  • 3837RFQ ATI - Plastik HD Roll Emboss4 applied / 70 (5.7%)
  • 3905RFP. L07 IMPELLER & CENTRIFUGAL PUMP STARLEN1 applied / 112 (0.9%)
Avg Bids per RFP (90 d)
4.8
66 RFP (90d)
314 bids total
Team avg: 5.2
-0.5 (-9%) vs prev
5.35.35.34.807-2007-2708-0308-10
Home Winner Rate (90 d)
9.4%
3 home / 32 with winner (90d)
Team avg: 27.3%
-0.9 (-9%) vs prev
8.71210.39.407-2007-2708-0308-10
Show by TSM (1)
  • Kania Mega Tantri — 3 / 32 (9.4%)
Invited Winner Rate (90 d)
25%
TSM: 8 · AI: 3 · Cust: 3
No invite info: 18 / 32 total (90d)
Team avg: 28%
+4.3 (+21%) vs prev
26.12420.72507-2007-2708-0308-10
Show details (32)
  • 2606ATK HO APRIL 2026 (FINALISASI)?
  • 2780Lanyard/ID Card Holder PT Naraya (perubahan spek kulit asli)?
  • 272010321235 - CONSUMABLE MEKANIK SURABAYA (FINALISASI)?
  • 2774TAHAP NEGOSIASI - PENGADAAN ATK PT CHAKRA JAWARA SURABAYA?
  • 2787Desktop Memory : V-GeN Platinum DDR5 16GB PC44800 5600MHzTSM
  • 2946Avometer Digital SANWA dan Kunci Shock (Perubahan Spek)TSM
  • 2956RFQ Riksa Uji K3 - FPS 2169?
  • 2973RFQ Riksa Uji K3 - FPS 2207?
  • 2918(FINALISASI) LOKER KABINET KARYAWAN 6 PINTUAI
  • 300710324607 - Gimmik Quiz Activity - SEM Insight Day 2026AI
  • 3042Consumable Cakung?
  • 3082Renewal Adobe LicenseTSM
  • 3057Stage 2 RFQ Freont AC Merk Daikin - FPS 2247?
  • 321910325028 & 10325082 - Maintenance Forklift CAT HM 3250TSM
  • 323710324252-CONSUMABLE WAREHOUSE JUNI PULOGADUNG (URGENT)Cust
  • 3294Totebag bahan spounbound Qty : 3.000pcsCust
  • 3330RFQ Stiker naik turun tangga - FPS 2299?
  • 3347RFQ Riksa Uji K3 - FPS 2556TSM
  • 3430RFQ Xiaomi Redmi Note 14 Pro 5G 8/256 GBTSM
  • 3483Lunch box ( tempat makan ) + Logo ( cetak logo )?
  • 3273Kebutuhan Binocular Microscope 1600x - SubangAI
  • 3564Lisensi SketchUp Education For UniversityCust
  • 3577Perbaikan spring bed uk 90x200x23 cm?
  • 3315(Negosiasi) RAM V-gen Platinum SODIMM DDR4 8GB 3200Mhz?
  • 3027Pengadaan Samsung Tablet S10 + Adapter (Stage 1)?
  • 3465Pengadaan AC Panasonic?
  • 3621[New Stage Negosiasi Final] RFQ Mesin Gerinda?
  • 3776[First Stage] License BitriseTSM
  • 3796Maintenance Tahunan Genset 350 KVA 2 Unit?
  • 3814Water Boiler?
  • 3831RFQ Consumable Building - FPS 2890TSM
  • 3781FINALISASI NEW RFQ FPS-ECII-2026-2978 dan 2968 Pembuatan Dinding Totem dan Signage Erha Central Cimanuk?

Summary

Summarising
Total RFP — 77
Summarizing RFP — 18 (23.4% from 77)
Summarizing RFP <3 bids — 7 (38.9% from 18)
Conversion completed→winner
Total RFP — 77
Completed RFP — 52 (67.5% from 77)
Completed RFP with winner — 34 (65.4% from 52)

Team Table last week

TSMActive RFPSummarizing (<3)Completed (<3)Zero bids (summarizing + completed)Workbench delivery %
Kania Mega Tantri1721066.6%

Focus RFP Next Week (Low Liquidity)

RFP IDCompanyRFP nameTSMBidsInvites SSMAcceptance End
3916PT. TRI SWARDANA UTAMAPENGIRIMAN UNIT TIPE WHEEL LOADER 676D KE KUTAI KALIMANTAN TIMURKania Mega Tantri2632026-08-19 02:45:00
3942PT Barata Indonesia (Persero)RFQ Kawat Las Böhler FOX 2.5Ni (AWS A5.5: E8018-C1 H4R)Kania Mega Tantri1812026-08-19 06:18:00
3965Arya NobleRFQ Kebutuhan rambut untuk analisaKania Mega Tantri0112026-08-21 05:00:00

Risks & Focus

Weekly snapshot
Active RFP17
Completed7
Avg Bids per RFP4.8
WB Delivery66.6%
WB TSM: Rel → Bids3.3%
Risks
  • Workbench TSM: Relevant → Bids conversion declining (2 weeks in a row)
Focus
  • Improve Workbench invitation quality — increase relevant supplier match rate