TSM Weekly Report

Week: 2026-08-24 - 2026-08-30  ·  Faten Rusli
Generated at 2026-08-30 21:57 UTC

KPI (MTD) · August 2026

EMPLOYEE MPS
51.8
Team avg: 55.8
53.565.951.8JunJulAug
T1 Quality of sourcing
8.6%
Total RFPs: 28
Result_count: 12
Result, %: 42.9%
Weight: 20
8.223.68.6JunJulAug
Show tenders (12)
  • 3798RFQ Vendor Psikotest Online - FPS No 2930 (Perpanjangan Waktu)16.7%diff: 71.6%
  • 3834RFQ Relay Octo - FPS 297116.7%diff: 13.2%
  • 3262[TAHAP 3] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA16.7%diff: -11.9%
  • 3932RFQ Pembuatan Sertifikasi PBG dan Perizinan SLF - FPS 318516.7%diff: 52%
  • 3903Purifikasi Trafo - 1250 KVA16.7%diff: 8.5%
  • 3872PENGIRIMAN UNIT TIPE WIDE BODY TRUCK 3110F, DOZER 832F, GRADER 922, LOADER 676 KE MUARA ENIM16.7%diff: -5.3%
  • 3499(Perpanjangan Waktu) RFQ - Kebutuhan Kertas HVS A4 60 & 75 Gsm (Any Brand) Selama 1 Tahun16.7%diff: 18.1%
  • 3859RFQ ATI - Sticker GWP16.7%diff: 2.3%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.7%diff: 7%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.7%diff: 1.8%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.7%diff: 15.1%
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.7%diff: 10.5%
T2 Timing of sourcing
10%
Total RFPs: 28
Result_count: 28
Result, %: 100%
Weight: 10
109.510JunJulAug
Show tenders (28)
  • 3798RFQ Vendor Psikotest Online - FPS No 2930 (Perpanjangan Waktu)16.7%diff: 71.6%
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)16.7%diff: 17.8%
  • 3779FINALISASI NEGO RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.7%diff: 69.1%
  • 3994RPF. L07 Pengadaan IT ( PT Selamat Sempurna Tbk )16.7%diff: -2.1%
  • 3834RFQ Relay Octo - FPS 297116.7%diff: 13.2%
  • 3766[TAHAP 2] PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE KERANG DAYO KALTIM16.7%diff: 0.9%
  • 3770PENGIRIMAN UNIT TIPE DOZER 818F KE MUKUT BARITO UTARA16.7%diff: 11.3%
  • 3262[TAHAP 3] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA16.7%diff: -11.9%
  • 3955[RFQ] LinkedIn Recruiter Lite16.7%diff: -16.7%
  • 3849RFP. L07 PISTON PUMP ( Perpanjangan waktu )16.7%diff: -11.7%
  • 3327RFQ Kontrak 1 Tahun Pengangkutan dan Pengolahan Limbah Domestik - FPS 248716.7%diff: -41.5%
  • 3932RFQ Pembuatan Sertifikasi PBG dan Perizinan SLF - FPS 318516.7%diff: 52%
  • 3903Purifikasi Trafo - 1250 KVA16.7%diff: 8.5%
  • 388417 unit Smart Projector16.7%diff: 53.8%
  • 3872PENGIRIMAN UNIT TIPE WIDE BODY TRUCK 3110F, DOZER 832F, GRADER 922, LOADER 676 KE MUARA ENIM16.7%diff: -5.3%
  • 3732PENGIRIMAN UNIT TIPE SOIL COMPACTOR 512 DAN MOTOR GRADER 915 KE JAYAPURA PAPUA16.7%diff: -6.2%
  • 3499(Perpanjangan Waktu) RFQ - Kebutuhan Kertas HVS A4 60 & 75 Gsm (Any Brand) Selama 1 Tahun16.7%diff: 18.1%
  • 3809[ Tahap Negosiasi] Polo Shirt for Service Dept16.7%diff: 28.3%
  • 3859RFQ ATI - Sticker GWP16.7%diff: 2.3%
  • 3845[Tahap Negosiasi] Polo Shirt for Service Dept16.7%diff: -16.7%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.7%diff: 7%
  • 3704Publish Article di Media Digital16.7%diff: -2.4%
  • 3786RFQ konsultan perencanaan16.7%diff: -16.7%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.7%diff: 1.8%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.7%diff: -1.7%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.7%diff: 15.1%
  • 3699Renovasi Kitchen Rumah Sakit di Palembang16.7%
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.7%diff: 10.5%
T3 Zero-bid RFPs
9.6%
Total RFPs: 28
Result_count: 27
Result, %: 96.4%
Weight: 10
09.59.6JunJulAug
Show tenders (27)
  • 3798RFQ Vendor Psikotest Online - FPS No 2930 (Perpanjangan Waktu)16.7%diff: 71.6%
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)16.7%diff: 17.8%
  • 3779FINALISASI NEGO RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.7%diff: 69.1%
  • 3994RPF. L07 Pengadaan IT ( PT Selamat Sempurna Tbk )16.7%diff: -2.1%
  • 3834RFQ Relay Octo - FPS 297116.7%diff: 13.2%
  • 3766[TAHAP 2] PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE KERANG DAYO KALTIM16.7%diff: 0.9%
  • 3770PENGIRIMAN UNIT TIPE DOZER 818F KE MUKUT BARITO UTARA16.7%diff: 11.3%
  • 3262[TAHAP 3] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA16.7%diff: -11.9%
  • 3955[RFQ] LinkedIn Recruiter Lite16.7%diff: -16.7%
  • 3849RFP. L07 PISTON PUMP ( Perpanjangan waktu )16.7%diff: -11.7%
  • 3327RFQ Kontrak 1 Tahun Pengangkutan dan Pengolahan Limbah Domestik - FPS 248716.7%diff: -41.5%
  • 3932RFQ Pembuatan Sertifikasi PBG dan Perizinan SLF - FPS 318516.7%diff: 52%
  • 3903Purifikasi Trafo - 1250 KVA16.7%diff: 8.5%
  • 388417 unit Smart Projector16.7%diff: 53.8%
  • 3872PENGIRIMAN UNIT TIPE WIDE BODY TRUCK 3110F, DOZER 832F, GRADER 922, LOADER 676 KE MUARA ENIM16.7%diff: -5.3%
  • 3732PENGIRIMAN UNIT TIPE SOIL COMPACTOR 512 DAN MOTOR GRADER 915 KE JAYAPURA PAPUA16.7%diff: -6.2%
  • 3499(Perpanjangan Waktu) RFQ - Kebutuhan Kertas HVS A4 60 & 75 Gsm (Any Brand) Selama 1 Tahun16.7%diff: 18.1%
  • 3809[ Tahap Negosiasi] Polo Shirt for Service Dept16.7%diff: 28.3%
  • 3859RFQ ATI - Sticker GWP16.7%diff: 2.3%
  • 3845[Tahap Negosiasi] Polo Shirt for Service Dept16.7%diff: -16.7%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.7%diff: 7%
  • 3704Publish Article di Media Digital16.7%diff: -2.4%
  • 3786RFQ konsultan perencanaan16.7%diff: -16.7%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.7%diff: 1.8%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.7%diff: -1.7%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.7%diff: 15.1%
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.7%diff: 10.5%
T4 RFPs with 3+ bids
23.6%
Total RFPs: 28
Result_count: 22
Result, %: 78.6%
Weight: 30
35.323.223.6JunJulAug
Show tenders (22)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)16.7%diff: 17.8%
  • 3779FINALISASI NEGO RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta16.7%diff: 69.1%
  • 3994RPF. L07 Pengadaan IT ( PT Selamat Sempurna Tbk )16.7%diff: -2.1%
  • 3834RFQ Relay Octo - FPS 297116.7%diff: 13.2%
  • 3766[TAHAP 2] PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE KERANG DAYO KALTIM16.7%diff: 0.9%
  • 3770PENGIRIMAN UNIT TIPE DOZER 818F KE MUKUT BARITO UTARA16.7%diff: 11.3%
  • 3262[TAHAP 3] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUA16.7%diff: -11.9%
  • 3849RFP. L07 PISTON PUMP ( Perpanjangan waktu )16.7%diff: -11.7%
  • 3932RFQ Pembuatan Sertifikasi PBG dan Perizinan SLF - FPS 318516.7%diff: 52%
  • 3903Purifikasi Trafo - 1250 KVA16.7%diff: 8.5%
  • 388417 unit Smart Projector16.7%diff: 53.8%
  • 3872PENGIRIMAN UNIT TIPE WIDE BODY TRUCK 3110F, DOZER 832F, GRADER 922, LOADER 676 KE MUARA ENIM16.7%diff: -5.3%
  • 3732PENGIRIMAN UNIT TIPE SOIL COMPACTOR 512 DAN MOTOR GRADER 915 KE JAYAPURA PAPUA16.7%diff: -6.2%
  • 3499(Perpanjangan Waktu) RFQ - Kebutuhan Kertas HVS A4 60 & 75 Gsm (Any Brand) Selama 1 Tahun16.7%diff: 18.1%
  • 3809[ Tahap Negosiasi] Polo Shirt for Service Dept16.7%diff: 28.3%
  • 3859RFQ ATI - Sticker GWP16.7%diff: 2.3%
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))16.7%diff: 7%
  • 3704Publish Article di Media Digital16.7%diff: -2.4%
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP16.7%diff: 1.8%
  • 3733PENGIRIMAN UNIT DOZER 818F-SU BLADE KE MUSI BANYUASIN SUMATERA SELATAN16.7%diff: -1.7%
  • 2917[UPDATE SPEK] RFP HAND PALLET 2.5 TON16.7%diff: 15.1%
  • 3650RFP L14 PERMINTAAN SEMEN PCC JAKARTA/TIGA RODA16.7%diff: 10.5%

Operational Metrics

Workflow

Active RFP
9
4 companies
Team avg: 11.2
-9 (-50%) vs prev
172018908-0308-1008-1708-24
Show details (9)
  • 3327RFQ Kontrak 1 Tahun Pengangkutan dan Pengolahan Limbah Domestik - FPS 24872 bids
  • 3757Pengadaan & Pergantian Instalasi HVAC OT1 & OT3 RS di Palembang2 bids
  • 3779FINALISASI NEGO RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central Yogyakarta5 bids
  • 3798RFQ Vendor Psikotest Online - FPS No 2930 (Perpanjangan Waktu)2 bids
  • 3834RFQ Relay Octo - FPS 29714 bids
  • 3893[Preliminary Stage] CMEP Astro facilities 2026 Jabodetabek0 bids
  • 4119(COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 822D KE KONAWE SULAWESI TENGGARA1 bids
  • 4126RFQ IT Asset5 bids
  • 4137Kebutuhan Fuel Pump Injection (FIP) Seri BH6P120 PN S00016266+010 bids
New RFP
3
Public — 3, Private — 0
Team avg: 3.2
+1 (+50%) vs prev
1082308-0308-1008-1708-24
Show details (3)
  • 4119(COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 822D KE KONAWE SULAWESI TENGGARA1 bids
  • 4126RFQ IT Asset5 bids
  • 4137Kebutuhan Fuel Pump Injection (FIP) Seri BH6P120 PN S00016266+010 bids
New stage
0
0 companies
Team avg: 1.4
-3 (-100%) vs prev
183008-0308-1008-1708-24
Completed RFP
3
Public — 3, Private — 0
Team avg: 4.2
-2 (-40%) vs prev
935308-0308-1008-1708-24
Show details (3)
  • 3834RFQ Relay Octo - FPS 29714 bids
  • 3903Purifikasi Trafo - 1250 KVA3 bids
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)4 bids
Public Completed <3 bids
0
0 companies
Team avg: 1
-1 (-100%) vs prev
211008-0308-1008-1708-24
Public Completed without winner
1
1 companies
Team avg: 1.8
-1 (-50%) vs prev
512108-0308-1008-1708-24
Show details (1)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)4 bids

Execution

Workbench cards (delivery, relevance, Relevant → Bids) are calculated on first-phase tenders only — TSM scores the full invited pool in phase 1; phases 2+ are shown for reference and excluded from these cards.
Workbench tasks delivery rate
97.5%
77 done / 79 total
Team avg: 57.8%
-2.5 (-2%) vs prev
98.893.210097.508-0308-1008-1708-24
Show details (4)
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 248725 / 25
  • 3798RFQ Vendor Psikotest Online - FPS No 293013 / 13
  • 3903Purifikasi Trafo - 1250 KVA12 / 12
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)27 / 29
Workbench relevance rate
94.8%
73 relevant / 77 done
Team avg: 71.3%
+4.8 (+5%) vs prev
86.792.19094.808-0308-1008-1708-24
Show details (8)
  • AI — 36 rel / 40 done
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 2487T:20 D:20 R:19 (95%)
  • 3798RFQ Vendor Psikotest Online - FPS No 2930T:7 D:7 R:5 (71.4%)
  • 3903Purifikasi Trafo - 1250 KVAT:4 D:4 R:3 (75%)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)T:9 D:9 R:9 (100%)
  • TSM — 37 rel / 39 done
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 2487T:5 D:5 R:5 (100%)
  • 3798RFQ Vendor Psikotest Online - FPS No 2930T:6 D:6 R:6 (100%)
  • 3903Purifikasi Trafo - 1250 KVAT:8 D:8 R:8 (100%)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)T:20 D:20 R:18 (90%)
Workbench AI: Relevant → Bids
0%
0 applied / 36 denom
Team avg: 1.1%
-2.8 (-100%) vs prev
0.94.32.8008-0308-1008-1708-24
Show details (4)
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 24870 applied / 19 (0%)
  • 3798RFQ Vendor Psikotest Online - FPS No 29300 applied / 5 (0%)
  • 3903Purifikasi Trafo - 1250 KVA0 applied / 3 (0%)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)0 applied / 9 (0%)
Workbench TSM: Relevant → Bids
2.7%
1 applied / 37 denom
Team avg: 4.1%
-13.3 (-83%) vs prev
14.120.4162.708-0308-1008-1708-24
Show details (4)
  • 3327Pengangkutan dan Pengolahan Limbah Domestik - FPS 24870 applied / 5 (0%)
  • 3798RFQ Vendor Psikotest Online - FPS No 29300 applied / 6 (0%)
  • 3903Purifikasi Trafo - 1250 KVA0 applied / 8 (0%)
  • 4001RFQ Pengadaan AC & Freon (FPS 3050)1 applied / 18 (5.6%)
Avg Bids per RFP (90 d)
5.3
70 RFP (90d)
369 bids total
Team avg: 5.2
-0.1 (-2%) vs prev
5.25.65.45.308-0308-1008-1708-24
Home Winner Rate (90 d)
17.9%
5 home / 28 with winner (90d)
Team avg: 27.9%
-0.6 (-3%) vs prev
18.216.718.517.908-0308-1008-1708-24
Show by TSM (1)
  • Faten Rusli — 5 / 28 (17.9%)
Invited Winner Rate (90 d)
42.9%
TSM: 12 · AI: 2 · Cust: 3
No invite info: 13 / 28 total (90d)
Team avg: 29.1%
-1.5 (-3%) vs prev
45.541.744.442.908-0308-1008-1708-24
Show details (28)
  • 2841RFQ Resertifikasi Riksa Uji K3 - FPS 1894?
  • 2936Pembelian Laptop ASUS Vivobook S14 S3407CATSM
  • 2948ATK PT Chakra JawaraTSM
  • 2954RFQ Riksa Uji K3 - FPS 2129TSM
  • 2958RFQ Riksa Uji K3 - FPS 2190AI
  • 297810324065 - ATK HO JUNI 2026TSM
  • 3104Lampu LED Panel dan Material Kelistrikan?
  • 3109RFQ Riksa Uji K3 - FPS 2397?
  • 3117(Re-open) perpanjangan waktu RFP Pouch canvas custom?
  • 3163RFQ Refill APAR EDC Kombes Sby (FPS 2426)TSM
  • 316410325532 - CONSUMABLE ZONA SOUTH SUMATERACustTSM
  • 3023Produksi Dompet dan Pouch?
  • 3225RFQ Riksa Uji K3 - FPS 2429?
  • 3202RFQ Consumable dan Alat Kerja (Revisi harga)?
  • 3528Mini NotesTSM
  • 3575Trolley Stainless Steel?
  • 2869(Tahap Finalisasi Harga) Renovasi Pengadaan Waterplay - Sekolah di BekasiTSM
  • 2726(Tahap 2 - Perubahan Spek) Fire Rescue Cabinet - Kota BandungAI
  • 3629Kebutuhan Kabel?
  • 348510327013 - SOLAR PERTAMINA DEX (FINALISASI)Cust
  • 3707[NEW SPEC] Tas Spundbond 25x35 - SEMARANG?
  • 3746RFP.L07 AXIAL FAN & DOSING PUMP?
  • 3515RFP.L07 - Pengadaan IT, Camera ( ADR ) Finalisasi harga ( Perpanjangan waktu ke 4 ))TSM?
  • 3903Purifikasi Trafo - 1250 KVA?
  • 3262[TAHAP 3] PENGIRIMAN SOIL COMPACTOR SEM 512 KE SORONG PAPUACust
  • 3834RFQ Relay Octo - FPS 2971TSM
  • 3994RPF. L07 Pengadaan IT ( PT Selamat Sempurna Tbk )TSM
  • 3779FINALISASI NEGO RFQ FPS-ECII-2026-2447 Pembuatan Signage dan Totem Erha Central YogyakartaTSM

Summary

Summarising
Total RFP — 163
Summarizing RFP — 36 (22.1% from 163)
Summarizing RFP <3 bids — 9 (25% from 36)
Conversion completed→winner
Total RFP — 163
Completed RFP — 122 (74.8% from 163)
Completed RFP with winner — 56 (45.9% from 122)

Team Table last week

TSMActive RFPSummarizing (<3)Completed (<3)Zero bids (summarizing + completed)Workbench delivery %
Faten Rusli920097.5%

Focus RFP Next Week (Low Liquidity)

RFP IDCompanyRFP nameTSMBidsInvites SSMAcceptance End
3757Hospital IndonesiaPengadaan & Pergantian Instalasi HVAC OT1 & OT3 RS di PalembangFaten Rusli2222026-09-01 11:00:00
4119PT. TRI SWARDANA UTAMA(COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 822D KE KONAWE SULAWESI TENGGARAFaten Rusli1212026-09-05 09:11:03.400000

Risks & Focus

Weekly snapshot
Active RFP9
Completed3
Avg Bids per RFP5.3
WB Delivery97.5%
WB TSM: Rel → Bids2.7%
Risks
  • Workbench TSM: Relevant → Bids conversion declining (2 weeks in a row)
  • Avg Bids per RFP declining (2 weeks in a row)
Focus
  • Improve Workbench invitation quality — increase relevant supplier match rate
  • Recruit additional suppliers for RFPs with low bid count