TSM Weekly Report

Week: 2026-10-05 - 2026-10-11  ·  Galih Kusuma Ardi
Generated at 2026-10-11 22:53 UTC

KPI (MTD) · October 2026

EMPLOYEE MPS
47.7
Team avg: 58.4
59.266.447.7AugSepOct
T1 Quality of sourcing
7.7%
Total RFPs: 13
Result_count: 5
Result, %: 38.5%
Weight: 20
6.787.7AugSepOct
Show tenders (5)
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 417017%diff: 16.7%
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 401917%diff: 3%
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102 [TAHAP 4]17%diff: 6.2%
  • 4804RFQ CALENDER 202717%diff: -13.4%
  • 4246Tender Cleaning Service Arya Noble Group 2027 (CLOSE PRELIMINARY)17%diff: 48.7%
T2 Timing of sourcing
10%
Total RFPs: 13
Result_count: 13
Result, %: 100%
Weight: 10
101010AugSepOct
Show tenders (13)
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)17%diff: -12.9%
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 417017%diff: 16.7%
  • 4789penggantian compressor unit outdoor AC split duct17%diff: 6.9%
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 401917%diff: 3%
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102 [TAHAP 4]17%diff: 6.2%
  • 4854Material Consumable Foundry Franco Gresik17%
  • 4841RFQ Temperature Sensor + Transmitter - FPS 326017%diff: -0.6%
  • 4804RFQ CALENDER 202717%diff: -13.4%
  • 4767RFP L19 - DIRECTIONAL VALVE & SOLENOID VALVE YUKEN (WAJIB TAIWAN)17%diff: 34.2%
  • 4730(COSTING CALCULATION) PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE MEULABOH ACEH17%diff: 28.9%
  • 4683RFP L09 - Raw Material - Kertas Kraft 350GR Mekabox17%diff: -17%
  • 4353RFQ Kontrak Servis 1 tahun STP Biotank - FPS 362617%diff: -17%
  • 4246Tender Cleaning Service Arya Noble Group 2027 (CLOSE PRELIMINARY)17%diff: 48.7%
T3 Zero-bid RFPs
9.2%
Total RFPs: 13
Result_count: 12
Result, %: 92.3%
Weight: 10
9.2109.2AugSepOct
Show tenders (12)
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)17%diff: -12.9%
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 417017%diff: 16.7%
  • 4789penggantian compressor unit outdoor AC split duct17%diff: 6.9%
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 401917%diff: 3%
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102 [TAHAP 4]17%diff: 6.2%
  • 4841RFQ Temperature Sensor + Transmitter - FPS 326017%diff: -0.6%
  • 4804RFQ CALENDER 202717%diff: -13.4%
  • 4767RFP L19 - DIRECTIONAL VALVE & SOLENOID VALVE YUKEN (WAJIB TAIWAN)17%diff: 34.2%
  • 4730(COSTING CALCULATION) PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE MEULABOH ACEH17%diff: 28.9%
  • 4683RFP L09 - Raw Material - Kertas Kraft 350GR Mekabox17%diff: -17%
  • 4353RFQ Kontrak Servis 1 tahun STP Biotank - FPS 362617%diff: -17%
  • 4246Tender Cleaning Service Arya Noble Group 2027 (CLOSE PRELIMINARY)17%diff: 48.7%
T4 RFPs with 3+ bids
20.8%
Total RFPs: 13
Result_count: 9
Result, %: 69.2%
Weight: 30
33.338.420.8AugSepOct
Show tenders (9)
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 417017%diff: 16.7%
  • 4789penggantian compressor unit outdoor AC split duct17%diff: 6.9%
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 401917%diff: 3%
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102 [TAHAP 4]17%diff: 6.2%
  • 4841RFQ Temperature Sensor + Transmitter - FPS 326017%diff: -0.6%
  • 4804RFQ CALENDER 202717%diff: -13.4%
  • 4767RFP L19 - DIRECTIONAL VALVE & SOLENOID VALVE YUKEN (WAJIB TAIWAN)17%diff: 34.2%
  • 4730(COSTING CALCULATION) PENGIRIMAN UNIT TIPE WHEEL LOADER 636D KE MEULABOH ACEH17%diff: 28.9%
  • 4246Tender Cleaning Service Arya Noble Group 2027 (CLOSE PRELIMINARY)17%diff: 48.7%

Operational Metrics

Workflow

Active RFP
15
6 companies
Team avg: 17.5
-4 (-21%) vs prev
2120191509-1409-2109-2810-05
Show details (15)
  • 3122RFQ Hologram Machine - FPS 14322 bids
  • 3243Sourcing Vendor Untuk Rencana Kebutuhan Project Renovasi Tahun 20270 bids
  • 4246Tender Cleaning Service Arya Noble Group 2027 (CLOSE PRELIMINARY)10 bids
  • 4400RFP Lo6 - Inner Linner - SSF4 bids
  • 4711Laptop Lenovo Thinkpad E14 Gen 8 Core 3 304 - FPS 4028, 4271,6 bids
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102 [TAHAP 4]15 bids
  • 4789penggantian compressor unit outdoor AC split duct5 bids
  • 4804RFQ CALENDER 202710 bids
  • 4841RFQ Temperature Sensor + Transmitter - FPS 32604 bids
  • 4854Material Consumable Foundry Franco Gresik0 bids
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 401910 bids
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 41709 bids
  • 4897RFQ Sparepart Pompa Drain AC Toshiba & Material FREON R410 11,3 kg - (FPS/GNLA/2026/4104)5 bids
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)2 bids
  • 5013RFQ Sertifikasi Baru Izin K3 ERHA Mataram - FPS 41871 bids
New RFP
4
Public — 4, Private — 0
Team avg: 8
-2 (-33%) vs prev
486409-1409-2109-2810-05
Show details (4)
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 41709 bids
  • 4897RFQ Sparepart Pompa Drain AC Toshiba & Material FREON R410 11,3 kg - (FPS/GNLA/2026/4104)5 bids
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)2 bids
  • 5013RFQ Sertifikasi Baru Izin K3 ERHA Mataram - FPS 41871 bids
New stage
2
1 companies
Team avg: 3
-1 (-33%) vs prev
733209-1409-2109-2810-05
Show details (2)
  • 4711Laptop Lenovo Thinkpad E14 Gen 8 Core 3 304 - FPS 4028, 4271,6 bids
  • 4897RFQ Sparepart Pompa Drain AC Toshiba & Material FREON R410 11,3 kg - (FPS/GNLA/2026/4104)5 bids
Completed RFP
4
Public — 4, Private — 0
Team avg: 7
-1 (-20%) vs prev
4105409-1409-2109-2810-05
Show details (4)
  • 1958Consumable Pabrik6 bids
  • 4438CETAK SERTIFIKAT LOGO ( UK . A4, BAHAN BC 160 GR ,CETAK COLOR 4/0, NOMERATOR 10 DIGIT )7 bids
  • 4789penggantian compressor unit outdoor AC split duct5 bids
  • 4854Material Consumable Foundry Franco Gresik0 bids
Public Completed <3 bids
1
1 companies
Team avg: 1.8
+1 vs prev
110109-1409-2109-2810-05
Show details (1)
  • 4854Material Consumable Foundry Franco Gresik0 bids
Public Completed without winner
2
1 companies
Team avg: 3.2
0 vs prev
322209-1409-2109-2810-05
Show details (2)
  • 1958Consumable Pabrik6 bids
  • 4854Material Consumable Foundry Franco Gresik0 bids

Execution

Workbench cards (delivery, relevance, Relevant → Bids) are calculated on first-phase tenders only — TSM scores the full invited pool in phase 1; phases 2+ are shown for reference and excluded from these cards.
Workbench tasks delivery rate
17.2%
231 done / 1 343 total
Team avg: 87.8%
-2.0 (-10%) vs prev
44.521.519.217.209-1409-2109-2810-05
Show details (10)
  • 4246Tender Cleaning Service, Security dan Juru Parkir38 / 84
  • 4438CETAK SERTIFIKAT LOGO ( UK . A4, BAHAN BC 160 GR ,CETAK COLOR 4/0, NOMERATOR 10 DIGIT )0 / 134
  • 4754Pompa Shimizu PC-503 BIT - FPS 41022 / 68
  • 4789penggantian compressor unit outdoor AC split duct41 / 58
  • 4804RFQ CELENDER 20270 / 104
  • 4841RFQ Temperature Sensor + Transmitter - FPS 326053 / 170
  • 4854Material Consumable Foundry Franco Gresik54 / 212
  • 4863RFQ Kebutuhan Camera Canon 1500D Include Memory - FPS 40195 / 40
  • 4887RFQ Laptop Lenovo Thinkpad E14 G7 - FPS 4198 & 417025 / 195
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)13 / 278
Workbench relevance rate
91.8%
212 relevant / 231 done
Team avg: 70.4%
-2.8 (-3%) vs prev
78.489.894.691.809-1409-2109-2810-05
Show details (11)
  • AI — 6 rel / 66 done
  • 4438CETAK SERTIFIKAT LOGO ( UK . A4, BAHAN BC 160 GR ,CETAK COLOR 4/0, NOMERATOR 10 DIGIT )T:37 D:37 R:0 (0%)
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102T:6 D:6 R:0 (0%)
  • 4789penggantian compressor unit outdoor AC split ductT:13 D:13 R:6 (46.2%)
  • 4804RFQ CELENDER 2027T:10 D:10 R:0 (0%)
  • TSM — 58 rel / 587 done
  • 4438CETAK SERTIFIKAT LOGO ( UK . A4, BAHAN BC 160 GR ,CETAK COLOR 4/0, NOMERATOR 10 DIGIT )T:97 D:97 R:0 (0%)
  • 4754Pompa Shimizu PC-503 BIT - FPS 4102T:62 D:62 R:2 (3.2%)
  • 4789penggantian compressor unit outdoor AC split ductT:45 D:45 R:35 (77.8%)
  • 4804RFQ CELENDER 2027T:94 D:94 R:0 (0%)
  • 4841RFQ Temperature Sensor + Transmitter - FPS 3260T:1 D:1 R:0 (0%)
  • 4854Material Consumable Foundry Franco GresikT:128 D:128 R:21 (16.4%)
  • 4932RFQ - Polynet 1 Roll 1,000 Meter (Merah, Kuning, Hijau & Putih)T:160 D:160 R:0 (0%)
Workbench AI: Relevant → Bids
0%
0 applied / 6 denom
Team avg: 0.3%
0 vs prev
5000009-1409-2109-2810-05
Show details (1)
  • 4789penggantian compressor unit outdoor AC split duct0 applied / 6 (0%)
Workbench TSM: Relevant → Bids
5.2%
3 applied / 58 denom
Team avg: 2.5%
-0.1 (-2%) vs prev
12.36.95.35.209-1409-2109-2810-05
Show details (3)
  • 4754Pompa Shimizu PC-503 BIT - FPS 41020 applied / 2 (0%)
  • 4789penggantian compressor unit outdoor AC split duct3 applied / 35 (8.6%)
  • 4854Material Consumable Foundry Franco Gresik0 applied / 21 (0%)
Avg Bids per RFP (90 d)
6.6
96 RFP (90d)
634 bids total
Team avg: 5.3
+0.2 (+3%) vs prev
5.96.16.46.609-1409-2109-2810-05
Home Winner Rate (90 d)
35.6%
16 home / 45 with winner (90d)
Team avg: 34.4%
+1.5 (+4%) vs prev
4133.334.135.609-1409-2109-2810-05
Show by TSM (1)
  • Galih Kusuma Ardi — 16 / 45 (35.6%)
Invited Winner Rate (90 d)
46.7%
TSM: 21 · AI: 0 · Cust: 6
No invite info: 19 / 45 total (90d)
Team avg: 33%
+1.2 (+3%) vs prev
43.642.245.546.709-1409-2109-2810-05
Show details (45)
  • 2282[VE] Renovasi Ruang ICU LT.29 - Rumah Sakit di Semanggi?
  • 2966Stage 2 Negosiasi - RFQ Pengadaan Unit CCTV dan Reinstalasi Jalur Kabel CCTV (FPS 2225)?
  • 2959Stage 2 Negosiasi - RFQ Pembuatan Instalasi Telepon Baru (FPS 1866)TSM
  • 3166WIRE SLING FRANCO GRESIKCust
  • 3410Pembelian Transcend MTE310S 512GB M.2 2230 NVMe PCIe Gen4 x4TSM
  • 3439Lanyard FYPL 2026TSM
  • 3546Uji kualitas Air dan Udara (Lingkungan)?
  • 2758[Final Perubahan BOQ & Negosiasi Harga] Pembuatan Ruang & Gudang Rekondisi Cabang MalangTSM
  • 3268Stage 2 Negotiation - RFQ Stress Ball (FPS 2416)TSM
  • 343210326471 - CONSUMABLE JAKARTA (FINALISASI)Cust
  • 2471[Pepanjangan waktu Final Negosiasi] Pekerjaan Perbaikan Fasilitas (Atap Canopi, Pompa Air, Plumbing, Listrik, dan Pekerjaan Pendukung) Cabang Soetta BandungCust
  • 2796TORQUE WRENCH UKURAN 60-420 NM QL420N (FINALISASI)Cust
  • 3715LOCK CAMSHAFT, LOCK FLYWHEEL, FEELER GAUGETSM
  • 3462RFQ Pengukuran Lingkungan & SKP Ahli K3 (EXTEND)TSM
  • 367210324618 - RFQ Fogging, Rodent trapping & proofing (EXTEND)?
  • 3765Catridge Printer LaserJet pro 200 color M25IN?
  • 3799PENGIRIMAN UNIT TIPE WHEEL LOADER 665F KE KOTABARU KALIMANTAN SELATAN?
  • 3805Buku Lembar JawabanTSM
  • 3811Pembelian Router Mikrotik RB 951TSM
  • 3565[FINAL STAGE] Scoreboard Basket di Lapangan Olahraga IndoorTSM
  • 3833Modul Skin - FPS 2943TSM
  • 3490[Finalisasi Harga] Kebutuhan Label Direct Thermal 100 x 100 mm Jakarta (Extend)?
  • 3925RFQ Perpanjang Izin K3 - FPS 3106TSM
  • 3985(COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 824F LGP WINCH KE CILINCING JAKARTA UTARA?
  • 4046[MALANG] Tas Spunbond?
  • 4057(COSTING CALCULATION) PENGIRIMAN UNIT TIPE DOZER 824F SU-BLADE KE BENGKULUTSM
  • 3600[Final Stage] RFQ ATI - Lakban Bening 2 Inch (48 mm x 81m x 48 Mic)?
  • 4064RFP L19 - DIGITAL CONTROLLER AZBIL (FINALISASI HARGA DAN STOCK)TSM
  • 4205OLI SHELL RIMULA R4 X 15W-40 - DRUM 209LTTSM
  • 4221RAM V-GEN 8GB DDR4 PC3200 SODIM?
  • 4194RFP L19 - Airless Paint Sprayer OFT-200 / Mesin Cat Semprot Untuk Cat Air & Cat Minyak ORIFETT (Tahap Negosiasi Harga)?
  • 4318RFQ Kebutuhan Catridge HP 11OA - (FPS 3674)?
  • 4410Kebutuhan Plaud Note Pro AI Voice Recorder - Jakarta?
  • 4438CETAK SERTIFIKAT LOGO ( UK . A4, BAHAN BC 160 GR ,CETAK COLOR 4/0, NOMERATOR 10 DIGIT )TSM
  • 4086Stage-3 Final Negosiasi pengadaan Jasa dan Sistem IT Inventory?
  • 4370Thermohygrometer / Data Logger - FPS 3505 - Best Price?
  • 2343KEBUTUHAN CCTV WAREHOUSE (FINALISASI)?
  • 4621(COSTING CALCULATION) PENGIRIMAN UNIT TIPE GRADER 2x915F DAN SOIL COMPACTOR 2x512 KE MUSI RAWAS SUMSELTSM
  • 4628RFP L04 - HIWIN?
  • 3661[Final Price ]Merchandise - PremiumTSM
  • 4665RFP L19 - LAMPU EXPLOSION PROOF LED HRLM EEW BPY236 2 X 18 WATTCust
  • 4277RFP L19 - EXHAUST FAN TYPE LR 54 - 3D 48" KOLOWA (Sesi 3, Negosiasi)TSM
  • 4767RFP L19 - DIRECTIONAL VALVE & SOLENOID VALVE YUKEN (WAJIB TAIWAN)TSM
  • 4293RFP.L07 Macam - macam part IT ( PT Selamat Sempurna )CustTSM
  • 4789penggantian compressor unit outdoor AC split duct?

Summary

Summarising
Total RFP — 211
Summarizing RFP — 29 (13.7% from 211)
Summarizing RFP <3 bids — 7 (24.1% from 29)
Conversion completed→winner
Total RFP — 211
Completed RFP — 176 (83.4% from 211)
Completed RFP with winner — 87 (49.4% from 176)

Team Table last week

TSMActive RFPSummarizing (<3)Completed (<3)Zero bids (summarizing + completed)Workbench delivery %
Galih Kusuma Ardi1511117.2%

Focus RFP Next Week (Low Liquidity)

RFP IDCompanyRFP nameTSMBidsInvites SSMAcceptance End
5013Arya NobleRFQ Sertifikasi Baru Izin K3 ERHA Mataram - FPS 4187Galih Kusuma Ardi1682026-10-13 08:00:00

Risks & Focus

Weekly snapshot
Active RFP15
Completed4
Avg Bids per RFP6.6
WB Delivery17.2%
WB TSM: Rel → Bids5.2%
Risks
  • New RFPs declining for 2 consecutive weeks
  • Workbench TSM: Relevant → Bids conversion declining (2 weeks in a row)
Focus
  • Boost new tender sourcing — investigate pipeline activity
  • Improve Workbench invitation quality — increase relevant supplier match rate